0093
Sector | Temporary Works |
Location | Holloway Road, London, UK |
Date | 2018 |
Status | Completed |
Role | Full temporary works designs |
Details | New residential development construction. Basement construction. Sheet pile designs. Underpinning design. Temporary propping to boundary walls. Formwork designs. |
Holloway Road, London, UK
640-650 Holloway Road is based in London, UK and is a residential development of concrete frame construction including basement construction. LSY Engineering Consultants carried out the design of sheet piles, underpinning and the temporary propping required for the boundary walls.