• IMG 1207
  • IMG 1205
  • IMG 1740
  • LSY Consultants Civil and Structural Design Engineers Residential Development Pilecap Construction jpg
  • LSY Consultants Civil and Structural Design Engineers Residential Development Slab Construction jpg
  • LSY Consultants Civil and Structural Design Engineers Residential Development Temporary Works 1 jpg
  • LSY Consultants Civil and Structural Design Engineers Residential Development Temporary Works 2 jpg
  • LSY Consultants Civil and Structural Design Engineers Residential Development Temporary Works 3 jpg
  • LSY Consultants Civil and Structural Design Engineers Residential Development Temporary Works 4 jpg
  • LSY Consultants Civil and Structural Design Engineers Residential Development Temporary Works 5 jpg
  • LSY Consultants Civil and Structural Design Engineers Residential Development Temporary Works 6 jpg
0093
Sector Temporary Works
Location Holloway Road, London, UK
Date 2018
Status Completed
Role Full temporary works designs
Details New residential development construction. Basement construction. Sheet pile designs. Underpinning design. Temporary propping to boundary walls. Formwork designs.

Holloway Road, London, UK

640-650 Holloway Road is based in London, UK and is a residential development of concrete frame construction including basement construction. LSY Engineering Consultants carried out the design of sheet piles, underpinning and the temporary propping required for the boundary walls.