Sector Temporary Works
Location Hotel, Hatton Cross, London, UK
Date 2018
Status Completed
Role Full temporary works designs
Details New hotel development. Concrete frame construction. Basement construction. Sheet pile designs. Temporary batter designs for excavations. Thrust block design.

Hatton Cross Hotel, Hatton Cross, London, UK

The Hatton Cross Hotel involved the construction of a double basement and six storey RC Frame next to Hatton Cross Station. This was a challenging project logistically, as the hotel was under a flight path, and we were subject to heavy crane restrictions. LSY Engineering Consultants Ltd carried out the sheet pile designs, temporary batter designs for excavations and thrust block design.