0087
Sector | Infrastructure |
Location | EBR, Heathrow, London, UK |
Date | 2018 |
Status | Completed |
Role | Full structural design |
Details | Pump station and flow meter upgrade project at EBR, Heathrow, London, UK. Structural steel design for pump station cover support system. Structural steel design for flow meter chamber cover support system. Steel connection design. Formwork designs. Site inspections. |
EBR, Heathrow, London, UK
LSY Engineering Consultants has completed the structural design of the steel structures for a new pump station and flow meter upgrade project at EBR, Heathrow, London, UK.
We also undertook the structural steel connection design and formwork designs, while also attending site inspections as the project progressed.